Courthouse Square
Sioux Falls, South Dakota
LEED Gold Certification (NC v2.1)
80,300 sq. ft. five floor office building
Project duration of 18 months
Courthouse Square HVAC system consists of chilled water generating templifiers served by a ground water system, a central boiler plant, radiant heating and cooling ceiling panels, a heat recovery unit tempering ventilation air, an under floor air distribution system, and a direct digital temperature control and building automation system.
