Projects - LEED
Avera Cancer Institute
Sioux Falls, South Dakota
261,463 sq. ft. five story medical facility
Project currently in progress
Avera Cancer Institute is in the early stages of construction, it is the intent of the Owner to pursue LEED certification for this project. The heating, ventilating and air conditioning system serving the Avera Cancer Institute consists of a central boiler plant, high efficiency water-cooled chillers, central station custom-fabricated air handling units, variable air volume (VAV) terminals, an overhead air distribution system, and a direct digital temperature control and building automation system.
