Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

LEED

MERC Gibbs courthouse Cherapa Avera Cancer Institue Armed Forces Reserve Center
MERC - Rochester Service Center Gibbs Elementary School Courthouse Square Cherapa Place    
MERC

Cherapa Place

Sioux Falls, South Dakota

LEED Gold Certification (NC v 2.2)

141,944 sq. ft. six story office building

Project duration of 18 months

Tessier’s involvement in Cherapa Place began early with the budgeting phase of this project as well as assisting the engineering team with the financial analysis of various HVAC system concepts. The heating, ventilating and air conditioning system serving Cherapa Place consists of a central boiler plant, a high efficiency air-cooled water chiller, central station air handling units located on alternate floors, an under floor air distribution system, and a direct digital temperature control and building automation system.


 

Main office - Mitchell, SD

218 East First Ave.

P.O. Box 1200

Mitchell, SD 57301-7200

605-996-7548

Sioux Falls, SD

700 West Cherokee

P.O. Box 112

Sioux Falls, SD 57101-0112

605-336-3175

Rapid City, SD

4310 Pendleton Drive

P.O. Box 2861

Rapid City, SD 57709-9616

605-341-1940

Omaha, NE

13609 “C” Street

P.O. Box 45264

Omaha, NE 68145-0264

402-597-6949

© 2009 Tessier's, Inc.

privacy and use

links

customer survey

feedback